Topics

FORECAST

ACQUIFER

VICTORIA

NSW

NT

WA

South

South Australia

DESALINATION

STORM

PRICE

GROUNDWATER

PIPELINE

QUEENSLAND

HANSARD

IRRIGATION

ALLOCATION

GRAYWATER

DROUGHT

WEATHER

RAIN

HYDRO

FIRE

TOWN

TANK

INDUSTRIAL

ENDOCRINE


Related Publications

Realtime NEM Data

Electricity Week

Energy Daily

Gas Week

Carbon Week

Spook Week

Kimberley News

Water Week


Login

Login:

Password:




New Visitors:
Sign Up free to search and read articles and (optional) free news headline emails

Media Mogul Toolbox

Get Weekly Volume

RSS Feed

(Log In to access search functions.)

 

South Australia emergency potable pipe; water from Tailem Bend and Strathalbyn to Raukkan, Narrung, Meningie and Langhorne Creek, Poltalloch Peninsula

 (proof version)  Karlene Maywald, Minister for the River Murray Minister for Water Security Wednesday, 20 August 2008, said a $50 million emergency project to construct two pipelines supplying potable water to Lower Lakes communities was to go to the Parliament Public Works Committee.  First water was to be delivered to communities by early 2009.

(Full Article)


Severe drought for River Murray system at August 2008; 6 per allocation, in South Australia, and zero in Victoria

(proof version) . The River Murray system remains in severe drought. The long-term average inflow for July is 1 190 GL and the previous minimum for July was 135 GL in July 2006.

(Full Article)


No water for communities below Lock 1, at the South Australia end of the Murray; emergency measures now a way of life

 (proof version) The Murray - Darling drought had extended and, there was only 1 570 GL in daily flows for the Basin, Emergency measures were now a way of life in the Murray - Darling Basin. The shortfall in River Murray water resources left either no water at all or barely enough for flows for critical needs.

(Full Article)